-x- NEW SOP Changes May22 -x- Flashcards
What are CM2 responsibilities for “Safety exterior inspection”?
Wheel chocks - check
L/G Doors - check position
APU area - check
Preliminary cockpit preparation for CM2 (seated)
Weather Radar and PWS - Off Eng Mode Sel - Norm Eng 1, 2 Master Levers - Off L/G lever - Down Wiper selectors - Off Bat - Check/Auto Ext Power - On APU Fire test - Perform APU - As required Ext Power - As required Air Cond - As required IR mode selectors - NAV
Preliminary cockpit preparation for CM2 (not seated)
Security search - As required Emer Eqpt - Check C/B panels - Check Rain repellent - Check Gear pins and covers - Check Fan cowl flags - Check Cockpit door locking system - Check Cockpit lights - As required
PM before walkaround tasks
Nav & Logo - Check on Accu/Brakes press - Check Flaps - Check position Spd brk lever - Check ret Park brake - On Walkaround - Perform
Which checklist is requested by PF when departure briefing is completed?
Cockpit preparation checklist
Which checklist is requested by PF when cleared for pushback and beacon is on?
Before start checklist
Which checklist is requested by PF when both engines have been started?
After start checklist
Which checklist is requested by PF when PM taxi flow pattern is complete and PEDS completed?
Taxi checklist
Which checklist is requested by PF when departure is changed (RWY or SID) between pushback and engine start?
Departure change checklist
Which checklist is requested by PF when cleared to line up by ATC and line up flow is completed?
Line-up checklist
Which checklist is requested by PF when first cleared to an altitude and cabin crew notified to prepare the cabin for landing?
Approach checklist
Which checklist is requested by PF when configured for landing and cabin is secure?
Landing checklist
Which checklist is requested by PF after doors disarmed confirmed by CM1 to SCCM?
Parking checklist
Which checklist is requested by PF when the last pax has disembarked with the intent to secure the aircraft?
Securing the aircraft checklist
What is the trigger for the following checklist - Cockpit preparation
When departure briefing is completed