Rod Control Flashcards

1
Q

Describe the 100 step overlap.

A

The rods have 228 steps. when the bank is pulled out 128 steps the next step out the next bank will start moving with it. Only if the control switch is in auto or manual.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the normal and backup control power supplies to the power cabinet?

A

Normal - is Phase A off of the Output of the MG sets through a step down transformer that steps it down from 260vac to 120vac.

Backup - is from CRP 3.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the trips of the M/G set supply breakers?

A
Control switch.
Load shed.
Load conservation.
Over current.
Trip push button.
NOT A REACTOR TRIP
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What train reactor trip bypass breaker B?

A

Train A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What train is reactor trip bypass breaker A?

A

Train B.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How does the reactor tip breakers ensure a reactor trip.

A

They are in series, if either trains get a trip signal, it breaks the power supply.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the purpose of the reactor trip bypass breakers?

A

To allow us to test the trip breakers on line.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the logic cabinet for?

A

It serves all 5 power cabinets.

Provides the brains for rod control movement (direction,speed,overlap)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What are the logic cabinet alarms / Indicator lights?

A

Urgent failure - can’t move rods.
Non-Urgent failure - power supply failure.
Power on - power from 5kva transformer.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What are the power cabinets for?

A

Converts 3 phase AC from MG sets to DC to energize CRDM coils.

It receives signal from the logic cabinet.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the Alarms / Indicator lights on the power cabinets?

A

Power on
Urgent failure
Power supply failure.
Group indicating

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Describe control bank speed.

A

IN AUTO
1.5* to 3* deviation in Auctioneered T-ave to T-ref. 8 steps per min.
3* to 5* they ramp from 8 to 72 spm
5+ degree deviation in Auctioneered T-ave to T-ref. 72 spm

IN MANUAL
they move 48 spm.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Shutdown banks rod speed

A

62 spm.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What feeds T-ave

A

T-hot and T-cold

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What feeds T-ref

A

Turbine first stage impulse pressure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is required to close the output breaker on the first mg set you start?

A

Both mg set output breakers have to be racked in and open.

17
Q

What are control rods made of?

A

80% Silver
15% Indium
5% Cadmium