Risk Analysis Flashcards
Risk us assessed by multiplying
Probability of occurrence of event x consequence of event
Negligible means
Unlikely to occur/ little consequence
Tolerable means
May cause accidents. Effort required to reduce it may outweigh benefits
Intolerable means
Hazard cannot be justified/ accepted
Reducing severity of consequence (C)
Possible at the construction planning stage
Reduce probability of occurence
Done at any stage during construction
Emergency preparedness=
To be prepared to take the most appropriate action on the event that a hazard becomes reality so as to minimise the effects and if necessary transfer personnel from a location with a high risk level to a low one
6 steps to emergency preparedness
Investigate accident What up do about it Take preventive measures and contain causes Escape to assembly point Evacuate personnel Rescue those evacuated
Emergency preparedness moves
Intolerable hazards into the tolerable reason