Paper 2 (Week 3 Quiz) Flashcards
What is the volume through an E6?
1
Which three things should a multiple-occupancy internal riser have?
2
What is the purge process above 0.02m3 and less than 0.035m3?
3
What is the maximum installation volume allowed to be worked on by a domestic engineer and what document covers this?
4
What information should be given to a customer prior to purging?
5
What is the purge volume on an imperial U6 meter?
6
What is perceptible movement?
7
What is the maximum allowed working pressure loss across a system?
8
What is the purge process below 0.02m3?
9
Where do you purge from?
10
List four criteria for pressure drop?
1
What is the maximum allowed pressure drop on –
• E6 meter with pipe > 28mm?
• G4 meter with pipe < 28mm?
• U16 meter with pipe > 28mm?
2
What are the flammability limits of methane (natural gas)?
3
What are the distances when notching joists?
4
For pipework fitted in ducts, what is the ventilation requirement for –
• 0.03m3
• 0.15m3
5