P&P Volume 4 Prevention Flashcards

1
Q

how much clearance should there be along access roads (defensible space)

A

10’ on each side of the road

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

how often do engine company inspect county roads that need hazard abatement within county right of way

A

annually, sent to VMP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

at what capacity should storage tanks be for fire use

A

90% with a refill device

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

where are burns not allowed

A

solvang, santa maria, lompoc

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

when shall district road inspections be submitted

A

by march 31 annually

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

when can residential burns begin and when completed

A

10am and dead out by 4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

how often is the water system survey completed

A

annually

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

recreational fire

A

non-contained fire - no permit required

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

when can hazard reduction fires begin and end

A

start by 7, no new material after 12, and dead out by 4pm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

what are approved ignition devices

A
  1. matches
  2. road flares
  3. propane tortches or lighters
  4. drip torches
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

what is involved in the water system survey

A

checking hydrants and sprinkler systems in district

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

what is ag burning

A

fire to reduce waste from ag products

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

time range to re-inspect a business

A

14-21days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

which inspections are performed by FPD and not engine companies

A

R 3.1 and R-4

engines inspect all others

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

do we issue permits for bonfires

A

yes (ceremonial ones)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

fire hazard reduction burning

A

restricted to “high” or “very high” fire hazard severity zones

17
Q

what circumstances can an engine captain cancel a burning operation

A
  1. violation of permit
  2. fire hazard risk of operation
  3. fire/smoke nuisance
18
Q

which section of the dept has a master copy of all access roads

A

construction

19
Q

right of way burning

A

utility, levee, ditch maintenance allowed in cuyama valley only

20
Q

which permits, done by OPS, are “per activity”

A
open flames in assembly
carnivals
nitrate film
use of fire hydrants
fumigation
parade floats
tents
21
Q

what is vertical clearance considered for occupancy clearance along roads

A

13’6”

22
Q

how big should FD connections be on stored water sources

A

4” minimum at bottom of tank

23
Q

what are the 4 primary considerations for occupancy clearances

A
  1. access
  2. water for fire protection/fighting
  3. defensible space
  4. addressing
24
Q

when can ag burning begin

A

sunrise and no additional fuel can be added 2hrs prior to sunset

25
Q

where do we not issue burn permits, which protection area?

A

Federal Direct Protection Area (DPA)

26
Q

when are vegetation burns allowed

A

feb, may, august, nov.

27
Q

how far should a hydrant be from the structure

A

50-150’

28
Q

what level extinguisher is required

A

4A rated

29
Q

who has engine companies perform occupancy clearance inspections

A

planning and engineering

30
Q

bonfire

A

used for ceremonial purposes

31
Q

a fire hydrant rise should be within how many feet from a hydrant

A

10’ of fire dept. approved access road

32
Q

what is considered ag waste

A

wasted used to:

  1. purpose of making profit
  2. provide livelihood
  3. research/instruction for education
  4. vegetation in adjacent fields
  5. material imminetly related to crop
  6. tumbleweeds
33
Q

proper addressing size for residential and commercial building

A

3” and 6” respectively