LOT 110.01 Operating Limits Flashcards

1
Q
  • LCO 3.1.1.1 SDM*
    • *

When is LCO 3.1.1.1 SDM Applicable?

A

MODES 1 - 5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  • LCO 3.1.1.1 SDM*
    • *

What must SDM be greater than in MODES 1 -2?

A

> 1.3 % ∆p

SDM: The instantaneous amount of reactivity by which the reactor is subcritical or would be subcritical from its present condition assuming:

  • All RCCAs fully inserted
  • Highest reactivity RCCA fully withdrawn
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  • LCO 3.1.1.1 SDM*
    • *

What is the bases for the different regions of the SDM curve in the COLR?

A

Constant SDM Region (1.3 % ∆p)

Protect against uncontrolled C/D from SLB

Variable SDM Region

Protect against boron dilution accident

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  • LCO 3.1.1.1 SDM*
    • *

When must SDM be verified prior to criticality?

A

MODE 2 w/ keff < 1

Within 4 hrs prior to criticality

Also performed prior to operations > 5% RTP after refueling.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  • LCO 3.1.1.1 SDM*
    • *

While in MODES 3-5, SDM must be evaluted once per 24 hrs. Which factors must be taken into consideration?

A

RCS Boron Concentration

Xenon Concentration

RCCA position

Tavg

Fuel Burnup

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  • LCO 3.1.1.1 SDM*
    • *

What are your ≤ 1 hour action(s) if SDM is not within the limits specified in the COLR?

A
  • LCO 3.1.1.1 SDM*
  • Action A*
    • *

Initiate Boration to restore SDM [15 min]

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

LCO 3.1.1.3 MTC

When is LCO 3.1.1.3 MTC Applicable?

A

BOL (+MTC) Limit

MODES 1-2

EOL (-MTC) Limit

MODES 1-3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  • LCO 3.1.3.1 Movable Control Assemblies*
    • *

When is LCO 3.1.3.1 Movable Control Assemblies Applicable?

A

MODES 1 and 2

All S/D and Control Banks shall be OPERABLE AND within ± 12 steps of their group step counter demand position.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  • LCO 3.1.3.1 Movable Control Assemblies*
    • *

What are your ≤ 1 hour action(s) if ≥ 1 rods inoperable due to being immovable due to friction / mechanical interference or is known to be untrippable?

A
  • LCO 3.1.3.1 Movable Control Assemblies*
  • Action A*
    • *
  • Determine SDM [1 hr]
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  • LCO 3.1.3.1 Movable Control Assemblies*
    • *

What are your ≤ 1 hour action(s) if 1 rod is trippable but inoperable due to something other than being immovable due to friction / mechanical interference OR > ± 12 steps from it’s group counter?

A
  • LCO 3.1.3.1 Movable Control Assemblies*
  • Action B*
    • *

Power Operation may continue provided:

  • Rod restored to OPERABLE status [1 hr]

OR

  • Rod declared INOPERABLE [1 hr]
  • Remainder of Rods in group aligned to within ± 12 steps on group counter while maintaining rod sequence and insertion limits of COLR [1 hr]
  • Thermal power restricted per LCO 3.1.3.6 Control Rod Insertion Limits [1 hr]

OR

  • Rod declared inoperable [1 hr]
  • Verify SDM [1 hr]
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  • LCO 3.1.3.1 Movable Control Assemblies*
    • *

What are your ≤ 1 hour action(s) if > 1 rod is trippable but inoperable due to something other than being immovable due to friction / mechanical interference?

A
  • LCO 3.1.3.1 Movable Control Assemblies*
  • Action D*
    • *

Power Operation may continue provided that:

  • Remainder of Rods in group aligned to within ± 12 steps on group counter while maintaining rod sequence and insertion limits of COLR [1 hr]
  • Thermal power restricted per LCO 3.1.3.6 Control Rod Insertion Limits [1 hr]
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  • LCO 3.2.1 AFD*
    • *

When ≥ 90% RTP, what are your ≤ 1 hour action(s) if AFD is outside the target band?

A
  • LCO 3.2.1 AFD*
  • Action A.1*
    • *
  • Restore AFD to target band [15 min]

OR

  • Reduce RTP to < 90% RTP [15 min]
    • *

Target band is +5 / -10

  • Note:*
  • Considered outside target band if ≥ 2 excore instruments indicating outside band.*
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
  • LCO 3.2.1 AFD*
    • *

When < 90% RTP but ≥ 50% RTP, what are your ≤ 1 hour action(s) if AFD is outside the target band?

A
  • LCO 3.2.1 AFD*
  • Action A.2*
    • *

Power operation may continue if:

  • Been outside target band ≤ 1 hr during last 24 hrs (Cumulative) [1 : 1 ratio]
  • AFD in accepatable region in COLR

Otherwise:

  • Reduce RTP < 50% RTP [30 min]
  • Reduce Power Range Flux High Trip ≤ 55% RTP [4 hrs]

​> 15% RTP but < 50% RTP with AFD outside the target band cumulates time in a 2 min : 1 min penalty ratio.

  • Note:*
  • Considered outside target band if ≥ 2 excore instruments indicating outside band.*
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
  • LCO 3.2.1 AFD*
    • *

When is LCO 3.2.1 AFD Applicable?

A

MODE 1, > 15 RTP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
  • LCO 3.2.2 Heat Flux Hot Channel Factor FQ(Z)*
    • *

When is LCO 3.2.2 Heat Flux Hot Channel Factor FQ(Z) Applicable?

A

MODE 1

Peak kW/ftAverage kW/ft

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q
  • LCO 3.2.2 Heat Flux Hot Channel Factor FQ(Z)*
    • *

What are your ≤ 1 hour action(s) if FQ(Z) is exceeding its limit?

A
  • LCO 3.2.2 Heat Flux Hot Channel Factor FQ(Z)*
  • Action A*
    • *

Reduce RTP 1% for each 1% FQ(Z) exceeds the limit [15 min]

May Continue power operation for 72 hrs if:

  • Lower OT∆T Rx trip 1% for each 1% FQ(Z) exceeds the limit
17
Q
  • LCO 3.2.3 Nuclear Enthalpy Rise Hot Channel Factor*
    • *

When is LCO 3.2.3 Nuclear Enthalpy Rise Hot Channel Factor Applicable?

A

MODE 1

18
Q
  • LCO 3.2.4 QPTR*
    • *

When is LCO 3.2.4 QPTR Applicable?

A

MODE 1 > 50% RTP

Max Upper ExcoreAverage Upper Excore

OR

Max Lower ExcoreAverage Lower Excore

19
Q
  • LCO 3.2.5 DNB Parameters*
    • *

When is LCO 3.2.5 DNB Parameters Applicable?

A

MODE 1

  • Tavg ≤ 595 ˚F
  • PZR Pressure > 2200 psig
  • Thermal Design Flow ≥ 392,000 gpm
  • Thermal Design Flow (COLR) > 403,000 gpm