F2 - SEM1 - What Is Flooding - 3.3 Flashcards

You may prefer our related Brainscape-certified flashcards:
1
Q

What are the 3 Preventive measures?

A

Engineering works - Man made structures and improvement works help regulate river discharge and increase channel capacity
Land use planning - Proper land use planning helps tackle flooding effective
Flood warning system - Issue warning signals according to the water level of rivers so that government and people can take precautionary measures (evacuation, stack sandbags)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the 2 Remedial measures?

A

Immediate rescue - Send rescue team to impacted areas to save people. Emergency supplies are provided to the victims
Clean-up works - Clean street and drain away floodwater. Repair damaged infrastructure (roads, bridges and electricity poles)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

___________ are sent to the impacted area to save people, emergency supplies including ___________ and water are provided for the victims

A

Rescue teams food and water

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

After a flood the streets are cleaned and the floodwater is drained away. ________________________ such as railways bridges and electric poles are _________ as well

A

Damaged infrastructure repaired

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The government uses technology to monitor rainfall. It also sets up f_______________ according to the water levels of rivers.

A

Flood warning signals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

When flooding is expected, an early warning will be issued so that government departments and people can take _____________________

A

Precautionary measures

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

why are dams and reservoirs built

A

to regulate river discharge downstream and store water

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

why are dykes built

A

to increase channel capacity and prevent rivers from overflowing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

why are river channels straightened, widened and deepened

A

to increase the speed of river flow and channel capacity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

what helps remove mud from river beds and maintain channel capacity ?

A

dredging

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

what is the programme name carried out in chang jiang to help reduce soil erosion and the silting of rivers

A

returning farmlannd to forest programme

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

what are the preventive measures

A
  1. building dams, reservoirs and dykes; straightening, widening and deepening river channels; carrying out dredging carefully
  2. carrying out afforestation; restoring lakes; adopting land use zoning
  3. setting up flood warning system
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the 2 main measures government used to reduce the flooding?

A

Preventive measure (before rainstorm)
Remedial measure (after flooding)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What are the Engineering works done to help regulate river discharge and increase channel capacity?

A

Build dams and reservoirs - regulate river discharge and store rainwater
Build dykes - increase channel capacity and prevent rivers from overflowing
Straighten, widen and deepen river channels - increase the speed of river flow and channel capacity
Dredging - remove mud from river beds and maintain channel capacity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What are the land use planning done to tackle flooding effectively?

A

Increase forest cover - carry out ‘Returning Farmland to Forest Programme’ and afforestation along Chan Jiang to reduce soil erosion and silting of rivers
Protect and restore lakes - carry out ‘Returning Farmland to Lake Programme’ and ban illegal reclamation of lakes to restore lake capacity
Land use zoning - plan the density of development along rivers according to the risk of flooding

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Areas further away from rivers have
__ flood risk
__ development is allowed

A

Areas further away from rivers have
Low flood risk
High-density development is allowed

17
Q

What are those areas close to rivers have higher flood risks planned for?

A

Buffer zones

18
Q

What are the 4 Flood warning signals in China?

A

Blue - water level close to the alert level
Yellow - water level reaches or exceed the alert level
Orange - water level reaches or exceed the safety level
Red - water level reaches or exceeds the historical high

19
Q

What were the measure government taken to address the large scale flooding in the summer of 2016?

A

Preventive measure
- Inspected and strengthened dams and dykes
- Issue rainstorm and flood warning signal to alter the public

Remedial measure
- Sent rescue teams to the affected areas
- Lowered the discharge released from the Three Gorges Dam to reduce the volume of water flooding downstream

20
Q

What are the measures to ease flooding in China?

A

Emergency measure (before rainstorm)
Issue early warnings > Evacuate People > Stack sandbags

Remedial measure (after rainstorm)
Send rescue team, provide emergency supplies > Repair infrastructure