E-Techlog Flashcards
Difference between MEL ref and Defect number?
Ref: 27-92-01A
Defect number:
Ex: P001 (found on sticker)
Stickers usually given in Hong Kong
Large Red R on defect means?
Repeat inspection
Restriction icons mostly Obvious:
E180, E 120, E No EDTO
But what does E PROC mean?
No EDTO downgrade but requires to follow certain procedures
History section shows how many previous sectors?
60 sectors
Can The prepare Flight section be done before the aircraft is released?
Yes.
It should be done asap.
Cabin crew login is only available after the commander has done the prepare Flight
POHFA
Good pneumonic for tech log
Prepare (pilot, plane, came in with)
Open items
History
Fuel
Accept/Airplane
Fuel record:
Do you need to see the picture of the fuel record?
Doesn’t say so:
Quantity: do the calculation, check the discrepancy
Quality:
Tap accept, see fuel type, supplier, date, etc.
Accept
When do you need to do refuelling station door cycling procedure?
300 aircraft only
When does commanders acceptance tab become available?
When aircraft is released for Flight
Are lesser checks allowed to expire during flight?
No.
Must remain valid for entire flight.
Beware of turn arounds.
Inquire with ENG.
What are the 777 lesser checks?
ETR - EDTO
DY - Daily (36 hours)
WY - weekly (8 elapsed days)
Ops 8.1.9.3
(Not to be repeated if came out of long term maintenance)
Rare occasion that all works have been carried out and signed for, but no engineer to release the aircraft.
Is it possible to override the release requirement and except the aircraft?
P.20 user guide
Yes.
- Contact IOC
- flight crew actions
(Commanders acceptance without release for Flight)
- need five letter code from IOC for authorisation code.
Is it legal to depart without sending the station copy??
NO
If remains red and says please wait or carry out alternative station copy fallback?
COMMANDERS ACCEPTANCE MUST BE RECEIVED BY GROUND SYSTEM
NEED TO SEE GREEN FLIGHT STARTED ENABLE AIRPLANE MODE

If cannot send station copy, what is alternative?
Section 9.1 User guide
Only items labelled “ items require station” require need to be recorded and signed on paper.
Need ENGINEER STILL.
E TECH STILL REMAINS THE MASTER , continue normal Operations 
Deicing seems quite flexible, what are the methods of selecting?
-Prepare flight stage
-Reporting tab
Note: if deicing prepared but not used it can be left open and the flight closed and it will be ignored