Division 1-General Requirements

A

-deals with administrative costs associated with the execution of the contract and the project- (overhead)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are fixed costs?

A

-one time project requirements.
-permits, prepaid insurance, office trailer furnishings, mobilization/demobilization.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are variable (time sensitive) costs?

A

-schedule driven and determined based on the length of time items or services are needed on the project.
-office trailer rental, temporary utilities, supervision, temporary fencing, traffic control, barricades.
-“means and methods” example: scaffolding for masonary: can use scaffolding, aerial lift, or plank scaffold. All require time to move, setup, and take apart.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Costs for Div.1 Gen. Reqmnts are often……

A

…left to the end of the estimate when you are familiar with the overall project.