How did you build a budget estimate?

A

1) Known rates, recent similar local works
2) Adjusted for Time, Quality and Location

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What advise would you give to the client to ensure the issue would not reoccur?

A

1) Use copper or aluminium fixings
2) Use Slate Hooks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Did the long term repairs get undertaken?

A

1) Yes and No

Yes to the nursery block worst affected area. Temporary snow guards were installed to the main building to catch/ collect any slipped slates in the meantime.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Did the long term repairs get undertaken?

A

1) Yes and No

Yes to the nursery block worst affected area. Temporary snow guards were installed to the main building to catch/ collect any slipped slates in the meantime.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What guarding did you install?

A

Mesh snow guard - steel. Fixed with over gutter brackets and sat just above the first tile.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How did you confirm it was Nail sickness?

A

Inspected batten near missing slate and identified stub of fixing in batten

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Where did you install the guarding’s? Why?

A

Long term future of the school building is unsure. Federation school with a nearby school therefore the building may become unused in the short to medium term

Installed anywhere a tile could fall off the building and cause injury.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What advice did you give to the client?

A

Remove immediate risk (Fencing/security). Closures and/ or diversions.

Renew roof coverings - Once begun nail sickness can become worse. Building same age.

Install guarding to certain areas of the building depending on funding availability and long term future of the building.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What did your initial inspection find?

A

Tingle repairs

Slipped/. Missing Slates

Broken slates on ground below

Tiles in gutters

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What did you conclude was the problem after your inspections?

A

Nail Sickness. Failure of fixings. Steel fixings with a coating. Nail sheared off.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

How did you inspect the issue?

A

Visual inspection initially

Scaffold high level inspect batten / Slipped tiles

How well did you know this?
1
Not at all