Book 1 Unit 2 Flashcards
The procedure for testing a directly connected gauge glass would be:
1. Close the gauge water valve
2. Open the gauge water valve
3. Close the gauge steam valve
4. Open the gauge steam valve
5. Close the gauge drain valve
6. Open the gauge drain valve
7. Proving steam passage is clear
8. Proving water passage is clear
A) 1,6,7,3,8,5
B) 1,6,7,2,8,3
C) 3,6,8,4,1,7,2
D) 3,6,8,2,7,5
E) 1,6,7,3,2,8,5
E) 1,6,7,3,2,8,5
The low water level fuel cut-off will shut off the fuel to the heating boiler when the water level drops below:
A) 50 mm (2 in) above the bottom of the gauge glass
B) The lowest visible part of the gauge glass
C) The lowest permissible water level
D) 25 mm (1in) above the bottom of the gauge glass
E) One half of the gauge glass
B) The lowest visible part of the gauge glass
The flame rod method of sensing is often referred to as:
A) Photoelectric scanning
B) The ionizing particle principle
C) Flame rectification
D) Infrared detection
E) Ultraviolet detection
C) Flame rectification
Quick closing gauge glass valves are operated by:
A) Levers and chains
B) Valve rods
C) Solenoids
D) Actuators
E) Diaphragms
A) Levers and chains
A pressure gauge can most accurately be calibrated by using:
A) The inspector’s test gauge
B) Hydraulic compactor
C) A test gauge comparator
D) A dead weight tester
E) Another pressure gauge
D) A dead weight tester
The Inspector’s test gauge is used to:
A) Test the pressure on the boiler
B) Confirm the pressure shown on the boiler pressure gauge
C) Measure the pressure on the boiler
D) Confirm that there is pressure on the boiler
E) Calibrate the pressure gauge on the boiler
B) Confirm the pressure shown on the boiler pressure gauge
In a gas fired boiler the fuel enters the furnace in a ___________ state mixes with combustion air and is ignited.
A) Solid
B) Vapourized
C) Liquid
D) Mixed
E) Gaseous
E) Gaseous
In an oil fired boiler the fuel enters the furnace in a ___________ state mixes with combustion air and is ignited.
A) Mixed
B) Liquid
C) Gaseous
D) Solid
E) Vapourized
E) Vapourized
The blowdown tank is/does:
A) Is not required on a low pressure boiler
B) Not cool the water
C) Does not allow the pressure to be reduced
D) Does not empty into the sewer
A) Is not required on a low pressure boiler
A programming control on a natural draft gas fires boiler operates in the following sequence.
1. The main burner is ignited
2. The flame detector senses the flame and causes the main gas valve to open
3. The ignition transformer and pilot gas valve are de-energized and closed, if an interrupted pilot is used
4. The operating control initiates a startup
5. The load relay energizes the ignition transformer and the pilot gas valve
A) 3,2,1,5,4
B) 2,5,1,4,3
C) 1,2,3,4,5
D) 5,3,2,1,4
E) 4,5,2,1,3
E) 4,5,2,1,3
When installing a pressure gauge and siphon on a boiler it is important to:
A) Fill the siphon with instrument oil
B) Allow the steam to condense in the siphon
C) Slowly open the valve to fill the siphon with steam
D) Fill the siphon with water first
E) Slowly open the valve to fill the siphon with water
D) Fill the siphon with water first
The voltage supply generated by the thermocouple is usually not more than:
A) 0 millivolts
B) 50 millivolts
C) 15 millivolts
D) 100 millivolts
E) 30 millivolts
E) 30 millivolts
Possible causes of low water level include:
1. Leaks cause by breakage or corrosion
2. Excessive blowdown
3. Automatic feedwater valve passing
4. Boiler feed pump failure
5. Excessive make-up
A) 1,2,4
B) 2,3,5
C) 2,3,4
D) 3,4,5
E) 1,2,3
A) 1,2,4
The purpose of the expansion tank in a hot water heating system is to:
A) Provide storage space for excess water
B) Provide storage space for excess steam
C) Add make-up water to the system
D) Provide space to store the returning condensate
E) Separate the water and steam produced
A) Provide storage space for excess water
A safety valve must be mounted:
1. In the horizontal position
2. To the boiler by a short nipple
3. At the highest practicable part of the boiler
4. With discharge water properly drained
5. With a valve next to the boiler
A) 2,3,4
B) 1,3,5
C) 2,4,5
D) 3,4,5
E) 1,2,3
A) 2,3,4