Assessment Flashcards

1
Q

TB161 – There are over ___ Electricity Dependent Residents in LA

A

4500

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

TB161 – Every __ morning, DWP provides a database of Electricity Dependent Residents to LAFD

A

Tuesday

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

TB161: Electricity Dependent Resident files will be treated as?

A

confidential

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

TB162 – Members entering compromised atmosphere is limited to __ minutes working time with a 60 min cylinder?

A

12 (9 with a 45 min bottle)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

TB162 – During the construction Phase of the Metro Rail Regional Connector, Engineers pump a max?

A

150

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

TB162 - Metro Rail Regional Connector Construction Phase has 2 ½” outlets every __ feet inside tunnel

A

200’

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

TB162 – The Metro Rail Regional Connector Construction Phase has what type of temporary water supply pipe inside the tunnel

A

6”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

TB162 – Tunnel 88 has what type of rescue breathers

A

18 complete Drager BG 4 re breathers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

TB162 - Metro Rail Regional Connector Construction Phase has intrinsically safe fans that are __CFM?

A

100,000

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

TB162: The construction dig of the Metro Rail Regional Connector will be __ feet deep

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

TB163 – During an incident inside the Crenshaw/LAX Line, The Brass Board shall be maintained by?

A

Staging

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

TB163 – The Crenshaw/LAX Line excavation equipment can tunnel up to ___ feet per day

A

70

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

TB163 – The Crenshaw/LAX Line will travel __ miles to the Metro Green Line

A

8.5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

TB163 – The Crenshaw/LAX Line will have __ stations

A

8

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

TB163 – At the Crenshaw/LAX Line construction sites, have a phone system with phones every __ ft?

A

800 to 1000

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

TB163 – During shift change at the Crenshaw/LAX Line construction site, as many as ___personnel may be on site

A

50 to 75

17
Q

TB163 - All stations are ____ design and are designed with 450 foot-long platforms

A