AERONAUTICAL ENGINEERING CORROSION CONTROL PROGRAM PROCESS GUIDE CGTO PG-85-00-60-A Flashcards
The Logistics Management Institute (LMI) estimated the annual corrosion cost for Coast Guard aviation alone to be how much?
$100 million dollars
In 2008, the combined cost of corrosion for all of DoD reached nearly how much?
$22.5 billion dollars
Corrosion Control Plan will be evaluated during a Logistics Compliance Inspection (LCI) performed by personnel from where?
(CG-41) and the Aviation Logistics Center (ALC)
Avionics Cleaning and Corrosion Prevention/Control manual?
NAVAIR 16-1-540
Who is responsible for addressing corrosion on behalf of the Commandant for all Coast Guard aviation platforms?
ALC
Who oversees the wash water analysis program?
Aviation Corrosion Program Manager
Air stations must ensure the guidelines contained here are properly documented in a written Corrosion Control Plan, usually kept where?
As part of a unit’s TIMI
What is the amount time of deferring a corrosion discrepancy and who can approve it for further?
30 days unless approved by the Engineering Officer
How often do EO’s review corrosion control plan?
Annually
LCI Process Guide?
CGTO PG-85-00-300-A
Unit Corrosion Program Manager must be what rate/rank?
AMT1, extreme cases can be senior AMT2
Nondestructive Testing and Inspection (NDT/I) guidelines are provided in what?
NAS 410, JSSG-2006, and MIL-HDBK-6870
If a product/chemical is not listed on the unit ACL, who should be consulted first?
ACPM and/or the appropriate Product Line Technical Services
When the relative humidity level is above _____, corrosion readily begins to accelerate?
60%
Deferring these types of paint discrepancies for extended periods is not encouraged nor authorized beyond 30 days without the approval of?
EO