3.3.2 Lockout-Tagout Flashcards
If lockout/tagout procedures are already in place by facility workers what should IMFD personnel do?
Add their own lockout/tagout device.
If lockout/tagout procedures have not been implemented by facility workers what should IMFD personnel do?
Initiate lockout/tagout procedures
Toggle switches, push buttons, and other types of control switches are/are not isolating devices?
Are not
All ____ must be dissipated or restrained by methods such as respoitioning, blocking, bleeding down, etc.
stored energy
Alternative positive means of disconnect the circuit or equipment may include what?
unplugging, disconnecting, or removing fuses
If no positive means of of disconnecting the circuit can be implemented, what should be done?
A FF equipped with a radio should be posted at the switch.
What should be done before removing lockout/tagout equipment?
photograph for evidence