Crew Assignment Options
Availability Factor
Describe this option
Number of available hours that a resource can be scheduled – fraction field
Used in Assignment Manager application
Asset Options
Record Asset History: On Change of Status to Complete or Close
Describe this option
Whether Asset history is recorded when Work Order changes to COMPLETE or CLOSED.
Asset Options (Linear)
Ignore history Work Orders on Start/End change?
Whether history work orders should be ignored when validating modification to a linear asset’s start or end measure.
Asset Options (Linear)
Propagate reference point measure changes?
When a reference point measure changes, should the changes be propagated to all records that reference it? This process can take a long time to complete.
Asset Options (Linear)
Linear Visual Control Message Configuration
Configure the appearance of Linear object symbols in the Linear Visual control display
Drilldown Options
Top Level Asset on Asset Tab:
* Top Level Starts at Top Level Location (Start at Top Location in Primary System)
* Top Level Starts at Top Level Asset (Show All Assets without Parent)
Specifies whether the drilldown should open to the Asset tab or the Location tab.
Safety Plan Options
Show Work Asset’s Hazards in the Select Hazards Action?
Displays hazards already associated with the asset (Safety Plans application, Asset associated to a Safety Plan)