Business Scenario:
---------------------------
The Production Order 60003308 is in process. The first operation is about to start and the operator has noted the time that the setup has begun.
The Production Manager would like this actual time entered into the system as soon as possible and has asked you to enter the Time Event into the Production Order for the first Operation.
TCODE: CO19
Procedural Steps:
SAP Easy Access
> SAP Menu
> Logistics